Before installing the Vulcan unit, the scanning machine could not read barcodes due to scale incrustations. Now after installed Vulcan, the machine is able to read these bar codes correctly. Bigard is now saving on maintenance costs and reduced time spent on cleaning the washing machine and white boxes.
We have had the Vulcan S 250 installed inside the hospital now for a couple of months. We can identify a considerable benefit of the unit installed. We can barely see any scale deposits on the shower heads any more. This saves manpower and costs associated with exchanging sanitary equipment.
This installation was a government project and before the Vulcan descalers were installed it took a great deal of effort and expense to clean the heat exchangers. The Vulcan system has already proven its effectiveness since it has greatly prolonged the cleaning intervals. This government contract has reported they are very satisfied with the results of the Vulkcan descalers being able to effectively solve mineral scaling problems of the heat exchangers.
Energy Complex has been awarded the highest level of Platinum Green Building Certification from LEED (Leadership of Energy and Environmental Design) for energy conservation, harmonious coexistence of industry and the environment and optimal utilization of resources.
Page 1 of 4