Vulcan Electronic mineral descalers solve scaling problems in the cooling towers of a molding factory.
Before Vulcan S100 was installed in hotel’s main hot water line, the storage tanks had a solid 3 cm thick scale layer inside them and the pumping pressure from the booster set was at maximum while being unable to deliver adequate water pressure to the end of the line hotel rooms.
The condenser and the oil cooling system have problems such as scaling and biological slime. It needs to be cleaned once every 3 months. The normal scale inhibitor dosage is about 200 kg per month. Besides, algaecide needs to be added every year from April to October. The Vulcan descaler save this company 4,733 USD every year!
Before installing the Vulcan electronic hard water mineral descaler, Hyundai Motor Ulsan had mineral scale problems in the pipelines and the induction hardening machine. The factory also had 9 secondary small pipes that had to be manually cleaned every 2-3 months.
Every month the heat exchanger efficiencies dropped dramatically because of an increase in pressure between inlet and outlet of the heat exchanger. Vulcan S250 models were installed and after 5 months there have not been any mineral scale pressure issues in the cooling towers or heat exchangers.
Page 3 of 5