One month after the installation of Vulcan S25, we made a test with a rusty nail. After two weeks the nail was clean. For us Vulcan is the easy solution against scale and rust and keeps our piping system and appliances clean. We need less maintenance and save money with it.
Traditionally a high amount of water is required for the extraction process to produce gelatin. For this we have our own deep wells from which the required water is drawn. Due to the area‘s geology, the ground water is relatively hard which inevitably results in thick layers of adherent limestone in the tanks. Some of which only were removable by using chemical substances. To remedy this, we have already taken one of your Vulcan systems into operation in the central hot water supply. We were stunned by it‘s results!
A 1,000 room resort located on the beachfront in Punta Cana, Dominican Republic. Two Vulcan S500 were installed on the main input pipe in order to combat scale build up and increase efficiency of the three cooling towers. A Vulcan S100 is also installed on the resorts main hot water system, in order to remove and prevent scale build up in the heaters/boilers, which provide hot water throughout the entire resort and casino.
Page 3 of 28